Search
Contact
Search
English
Search
BMW M3 Competition M Xdrive 2023 WBS43AY09PFN84790
Vehicle info
VIN
WBS43AY09PFN84790
Make
BMW
Model
M3 Competition M Xdrive
Production year
2023
Odometer
33398 mil
Primary damage
Front
Secondary damage
Left Side
Transmission
automatic
Fuel type
-
Drive
AWD
Keys
No
Auction info
Final bid $55750
Auction
IAAI CA
Lot
12640222
Date
2026-08-10
Seller
Documents
Status
Sold
Auctions of similar cars
BMW 320i 2014
VIN:
WBA3B1G57ENS78674
$825
BMW Ix 2024
VIN:
WB523CF07RCR74252
$500
BMW 330I 2024
VIN:
3MW69FF01R8E36768
$0
BMW 230xi 2023
VIN:
3MW33CM00P8C85389
$9600
BMW 430I 2021
VIN:
WBA53AP06MCG58595
$0
BMW 328D 2014
VIN:
WBA3D3C57EK153946
$1300
Other WBS43AY09PFN84790 lots
Auction
Lot
Price
Status
Mileage
IAAI CA
12640222
$55750
Sold
33398 mil
On Bidstat.info website, you can find final price, photos and detailed informations about cars sold on Copart.com and Iaai.com
Main Charactersistics of the lot:
Make: BMW
Model: M3 Competition M Xdrive
Production year: 2023
Lot 12640222
Additional Charactersistics:
The car has an attractive Blue body color
The date of the sale of the car was on 2026-08-10
What is the make of the car?
The car is a BMW
What is the model of the car?
The model of the car is the M3 Competition M Xdrive
What is the car's VIN number?
The VIN of the car is WBS43AY09PFN84790
What was the final price on the auction?
The final price is $55750
On which auction portal was the car sold?
The car was sold on IAAI CA auction
Ⓒ 2022 Bidstat. All Rights Reserved
Help
Homepage
Search database
Contact
Privacy policy
Contact
Email:
[email protected]
Telegram: https://t.me/BidStat