Search
Contact
Search
English
Search
BMW M5 CS 2022 WBS73CH02NCK02686
Vehicle info
VIN
WBS73CH02NCK02686
Make
BMW
Model
M5 CS
Production year
2022
Odometer
6950 mil
Primary damage
Front End
Secondary damage
Suspension
Transmission
automatic
Fuel type
Gasoline
Drive
AWD
Keys
No
Auction info
Final bid $64000
Auction
IAAI
Lot
41516411
Date
2025-03-10
Seller
Insurance company
Documents
Status
Sold
Auctions of similar cars
BMW 530I 2021
VIN:
WBA53BH04MCG83743
$0
BMW X5 Sdrive35i 2016
VIN:
5UXKR2C52G0R69101
$2175
BMW 330I 2019
VIN:
WBA5R1C58KFH10594
$100
BMW 430I 2017
VIN:
WBA4R7C59HK876330
$7600
BMW 430I 2017
VIN:
WBA4U7C52H5D43171
$3650
BMW X3 Sdrive30i 2020
VIN:
5UXTY3C09LLU70242
$9175
Other WBS73CH02NCK02686 lots
Auction
Lot
Price
Status
Mileage
IAAI
41516411
$64000
Sold
6950 mil
On Bidstat.info website, you can find final price, photos and detailed informations about cars sold on Copart.com and Iaai.com
Main Charactersistics of the lot:
Make: BMW
Model: M5 CS
Production year: 2022
Lot 41516411
Additional Charactersistics:
The car has an attractive Gray body color
The date of the sale of the car was on 2025-03-10
What is the make of the car?
The car is a BMW
What is the model of the car?
The model of the car is the M5 CS
What is the car's VIN number?
The VIN of the car is WBS73CH02NCK02686
What was the final price on the auction?
The final price is $64000
On which auction portal was the car sold?
The car was sold on IAAI auction
Ⓒ 2022 Bidstat. All Rights Reserved
Help
Homepage
Search database
Contact
Privacy policy
Contact
Email:
[email protected]
Telegram: https://t.me/BidStat